Overview
Once the tile setter is done, the valve and drain are sealed in for a generation. A cartridge body sitting too far back in the wall, a drain off-center from the pan, or a sweat joint nobody tested turns into a demolition job later. Rough-in is the moment to be fussy.
We work with your contractor or tile installer on placement. We set pressure-balanced or thermostatic valves, add handhelds, body sprays or rain heads, size supply lines so multiple outlets get enough water, and set or move the drain. Everything is tested before the wall is closed.
How we handle it
Plan placement
Valve depth, heights and drain location.
Rough in
Valve, risers, outlets and drain installed.
Pressure test
Before tile goes on.
What it costs
A valve and trim replacement is the simplest job. Full rough-ins with multiple outlets cost more, and moving a drain on a slab adds concrete work. Each item is priced so you can choose what to include.
Good to know
- Decide on handheld, rain head or body sprays before rough-in.
- Pick your valve trim early; it must match the valve body.
- Ask about a built-in shut-off for easier future service.
Tub-to-shower conversions are a popular remodel in northwest side homes. Moving the drain on a slab means a small concrete cut, which we plan to keep minimal.
Shower installation questions
Do you do tile work?
No, but we coordinate with your tile installer.
Can I supply my own valve?
Yes, if it includes the rough-in body.
What is a thermostatic valve?
A valve that holds an exact temperature. A step up from pressure balancing.
Can I have two people showering at once?
Yes, with separate valves or a valve that supports multiple outlets and adequate supply.